Durrat Al Doha Engineering – درة الدوحة الهندسية

Metro Goldline Project [ ALYSJ – RAIL ]

  • Scarifying/Excavation of unsuitable material consists of the removal of bushes, clay, Rock or any other material that is unsuitable in its original position and that is excavated below the finished grading.
  • Cut/fill up to the design level.
  • Disposal of Waste & surplus material.
  • Grading, Levelling, and Compacting.